SR 29 Comprehensive Multimodal Corridor Plan 2020

The SR 29 Comprehensive Multimodal Corridor Plan (SR 29 CMCP) evaluates the most constrained portion of SR 29 – an 11.5-mile portion that stretches from Imola Avenue (designated SR 121 east of SR 29) in the City of Napa to SR 37 in the City of Vallejo. The objective of the SR 29 CMCP is to develop a comprehensive multimodal package of prioritized improvements that address the corridor’s pre-eminent issues, including traffic congestion and delay, increased crash risks for all users, lack of low-stress multimodal connectivity,  reduced travel time and transit reliability.

PDF SR 29 CMCP 2020-Final Report
PDF SR 29 CMCP 2020-Final Appendices